Skip to main content

The 2013 Amgen Tour of California featured an uphill time trial in south San Jose.

http://www.amgentourofcaliforn...e/stages/stage6.html

Microgate Linkgate system was used as a backup to transmit the precise start times from the valley floor up to the finish at the top of the climb.

A synced TIMY2 pxe was recording TOD splits at the start.

Thanks to Chuck Hodge of Medalist Sports for the map and calculations.

Attachments

Images (3)
  • 500mw_SF_transmitter
  • Dec_Radio_SF
  • Course_map_with_red_line_showing_transmit
Last edited {1}
Original Post

Add Reply

Post
×
×
×
×
Link copied to your clipboard.
×