Skip to main content

Winter Park runs a great deal of MTB races in the summer. They challenged us to see what kind of distance and performance we could get with the Linkgate system.

We attached the Linkgate Enc radio 500mw SF transmitter to the window of the steel Race Central building.

A Microsync sent out constant pulses to simulate starts.

Up the lifts we went.

Attachments

Images (5)
  • End_radio_500_SF_transmitting_from_Race_Central
  • Testing_at_Sunspot
  • Riding_the_Panorama_lift
  • Racetime2_at_top_of_Winter_Park
  • Racetime2_screen_shot_at_top_of_Winter_Park
Last edited {1}
Original Post

Add Reply

Post
×
×
×
×
Link copied to your clipboard.
×